Ferry Lane - O Gauge

Home  About Us  Layouts  Exhibition  Membership  Contact Us

Ferry Lane
This is a terminus layout made up of four boards and including working signals with realistic operation, ie. signal bounce provided by using Megapoints Servo Controller boards. The points and signals are analogue controlled via a bespoke control panel including Cobalt signal levers. The locos are all DCC controlled using a Lenz system. It is quite early days scenically as the pictures show it is still under construction. The terminus end has a station building and cattle dock with a signal box and goods shed at the fiddle yard end.